From the WA briefing

Bellingham Bay

 The Port of Bellingham and Washington Department of Ecology removed approximately 230 cubic yards of contaminated soil from the construction site. The soil is contaminated with low levels of metals and hydrocarbons. The soil is stockpiled nearby while arrangements are made to properly dispose of it. Crews have been investigating the area known as the Westman Marine cleanup site for contamination left behind from previous boat and shipyard work dating back to the 1940s. (photo/via Department of Ecology)
 
Share on Facebook